Saturday, 3 October 2026
اردوहिन्दीEnglish
Awaz E Bihar
Awaz E Bihar
HomeE-PaperVideosNationalPoliticsSportsEducationBiharNationalPoliticsSportsHealthEducationArticlesWorld News
TopNationalPoliticsSportsEducationBiharNationalPoliticsSportsHealthEducationArticlesWorld News

Awaz E Bihar

Bihar's Voice — Breaking News in Urdu, Hindi & English

Categories

  • Local
  • National
  • Politics
  • Business
  • Technology
  • Sports
  • Health
  • Education

Quick Links

  • Home
  • E-Paper
  • Videos
  • Picture of the Day
  • About Us
  • Contact Us
  • Privacy Policy
  • Terms of Service

Newsroom

  • Editorial Policy
  • Corrections & Complaints
  • Advertise With Us
  • Newsroom Contact

Languages

  • اردو (Urdu)
  • हिन्दी (Hindi)
  • English

Follow Us

Email: awazebihar@gmail.com

Phone: +91-9473486854

© 2026 Awaz E Bihar Publications. All rights reserved

Designed and Developed byZeloiteZeloite
Ganga Path initial alignment finalized, way clear for DPR preparation
  1. Home
  2. Bihar
Bihar

Ganga Path initial alignment finalized, way clear for DPR preparation

Awaz E Bihar
•3 October 2026 at 07:37 am•0 views•2 min read

Patna, 3 October: Work has begun to advance the proposed projects related to the Ganga Path in Patna. The initial alignment of these Ganga Paths has been finalized. Before finalizing the alignment, a detailed technical review of various aspects will be conducted. For this, the consulting agency will be assigned responsibility.

The consulting agency will study the final alignment of the proposed routes as well as current and future traffic pressure. During this period, an attempt will be made to determine which areas can be connected to the proposed Ganga Path and where traffic pressure is likely to remain high. Taking into account the project's effectiveness and practical necessity, the final route will be determined.

A detailed estimate of the potential costs of constructing the Ganga Path will also be made. The consulting agency will study alignment, construction requirements, traffic, and other technical aspects to prepare a cost estimate for the project. Based on this report, the process of giving the project a final shape will proceed.

After the consulting agency's study, the final alignment will be determined. Subsequently, the relevant municipal corporation will prepare and submit a Detailed Project Report (DPR). The DPR will include the project's technical details, proposed route, construction work, expected cost, and other necessary information. According to the authorities, finalizing the initial alignment is one of the key stages of project preparation. After the consulting agency's report, the process of final alignment and DPR preparation will advance. After that, the next steps related to project implementation will be taken.
Share:

Awaz E Bihar

Experienced journalist and writer

More from Bihar

Aid package dropped from helicopter lands on head and chest of flood-affected person
Bihar

Aid package dropped from helicopter lands on head and chest of flood-affected person

3 Oct 2026
Bihar Floods: 20 Dead Across Eight Districts, Seven Missing in Saran
Bihar

Bihar Floods: 20 Dead Across Eight Districts, Seven Missing in Saran

3 Oct 2026
Gandhi's message of truth and non-violence, and Shastri's simplicity and service to the nation remain important today: Nitish Kumar
Bihar

Gandhi's message of truth and non-violence, and Shastri's simplicity and service to the nation remain important today: Nitish Kumar

2 Oct 2026
Relief and rescue operations intensify amid flood devastation in Sargodha, with 19 teams deployed
Bihar

Relief and rescue operations intensify amid flood devastation in Sargodha, with 19 teams deployed

2 Oct 2026
People are the true owners in a democracy: Chief Minister
Bihar

People are the true owners in a democracy: Chief Minister

2 Oct 2026
Flood situation grave; Ghandak embankment breach submerges new areas of Sarn
Bihar

Flood situation grave; Ghandak embankment breach submerges new areas of Sarn

2 Oct 2026