Thursday, 1 October 2026
اردوहिन्दीEnglish
Awaz E Bihar
Awaz E Bihar
HomeE-PaperVideosNationalPoliticsSportsEducationBiharNationalPoliticsSportsHealthEducationArticlesWorld News
TopNationalPoliticsSportsEducationBiharNationalPoliticsSportsHealthEducationArticlesWorld News

Awaz E Bihar

Bihar's Voice — Breaking News in Urdu, Hindi & English

Categories

  • Local
  • National
  • Politics
  • Business
  • Technology
  • Sports
  • Health
  • Education

Quick Links

  • Home
  • E-Paper
  • Videos
  • Picture of the Day
  • About Us
  • Contact Us
  • Privacy Policy
  • Terms of Service

Newsroom

  • Editorial Policy
  • Corrections & Complaints
  • Advertise With Us
  • Newsroom Contact

Languages

  • اردو (Urdu)
  • हिन्दी (Hindi)
  • English

Follow Us

Email: awazebihar@gmail.com

Phone: +91-9473486854

© 2026 Awaz E Bihar Publications. All rights reserved

Designed and Developed byZeloiteZeloite
Vikramshila Bridge collapse: Bihar government announces alternative route and repair plan
  1. Home
  2. Bihar
Bihar

Vikramshila Bridge collapse: Bihar government announces alternative route and repair plan

Awaz E Bihar•4 May 2026 at 02:29 pm•937 views•2 min read

Patna, May 4: The crucial Vikramshila Bridge, connecting Bhagalpur to north Bihar, collapsed late on Sunday night. Following the incident, the Bihar State Bridge Construction Corporation has recommended using the Sri Krishna Singh Bridge in Munger and the Ganga Bridge in Khagaria as alternative routes to connect south Bihar to north Bihar.

Bihar State Bridge Construction Corporation Chairman Dr. Chandrashekhar Singh informed during a press conference at the Auditorium of the Information Building on Monday that one of the spans of the Vikramshila Bridge has collapsed and will take around three months to repair. He also stated that traffic on the new bridge being constructed parallel to the Vikramshila Bridge is expected to resume by December this year.

Appreciating the prompt action by the Bhagalpur district administration, he said that if timely action had not been taken, the situation could have been more severe. He revealed that the Executive Engineer of the Bridge Construction Corporation has been suspended due to the immediate action. He acknowledged that there was heavy traffic pressure on the bridge and a recent inspection team from Patna had identified several technical flaws. IIT Patna will also be involved in the repair work.

As an alternative arrangement, vehicles heading to north Bihar have been advised to use the Sri Krishna Singh Bridge in Munger, and vehicles coming from north Bihar to Bhagalpur have been advised to use the Ganga Bridge in Khagaria. Currently, the plan to build a Peepa Bridge between Bhagalpur and Naugachhia has been postponed due to the monsoon. Meanwhile, preparations are underway to start a steamer service between Naugachhia and Bhagalpur.

Dr. Chandrashekhar Singh stated that as soon as the incident was reported, Chief Minister Samrat Choudhary contacted Union Defense Minister Rajnath Singh and requested assistance from the Border Roads Organisation (BRO), to which the Defense Minister assured all possible cooperation.

Notably, the incident occurred around 12:30 am on Sunday night when a portion near pillar number 133 started collapsing. Later, traffic was halted as a precaution, but shortly after, the part of the bridge collapsed.
Share:

More from Bihar

94 lakh 71 thousand people were tested for anemia, more than 18 lakh were diagnosed with anemia
Bihar

94 lakh 71 thousand people were tested for anemia, more than 18 lakh were diagnosed with anemia

29 Sept 2026
The dispute between Anant Singh and Neeraj Kumar reached the top leadership
Bihar

The dispute between Anant Singh and Neeraj Kumar reached the top leadership

29 Sept 2026
Official records to be digitized, citizens to get digital copies: Dr Dilip Jaiswal
Bihar

Official records to be digitized, citizens to get digital copies: Dr Dilip Jaiswal

29 Sept 2026
Bihar will be strong only with a strong foundation of children: Samrat Chaudhary
Bihar

Bihar will be strong only with a strong foundation of children: Samrat Chaudhary

29 Sept 2026
A seven-day sit-in at Garni Bagh, Shikhar Sevak, who has been serving for 17 years
Bihar

A seven-day sit-in at Garni Bagh, Shikhar Sevak, who has been serving for 17 years

29 Sept 2026
Several bank accounts of ADM Supply and wife will be closed
Bihar

Several bank accounts of ADM Supply and wife will be closed

29 Sept 2026